Parts Inspection Lookup
ID:
Part Number:
Dimension:
Description:
Target:
Upper Limit:
Lower Limit:
Notes:
1-23-08vp: Added Inspection Criteria. 1. Perform 1st pc inspection with MFT drawing. 2. Verify correct/current Part Number & Revision between MFT PO,MFT drawing, supplier Packing slip and part markings. 3. Verify pulley is anodized (including bore) with ohm meter. Inspection Tools Required: a. Bore Gage with data port (Dimension 1). b. Bore Gage .5-.65" adapter (PN 33318) and.64969" calibration ring. b. 6" caliper (Dimension 2).