Parts Inspection Lookup
ID:
Part Number:
Dimension:
Description:
Target:
Upper Limit:
Lower Limit:
Notes:
***NOTE: AFTER INSPECTION FROM INDUSTRIAL MOLDED RUBBER DO NOT PUT PARTS INTO INVENTORY. PLACE IN SHIPPING AREA TO BE SENT TO R&S GRINDING AND NOTIFY PURCHASING PERSONELL.*** 3-27-08vp: Effective after 8-2-07, 10971-XX parts from Industrial Molded Rubber will NOT have the final grind. IMR requested that MFT work directly with R&S Grinding. This will be a 2 part inspection. Bore: IMR, 10-16-08vp: Inspection Criteria (2 Step Inspection Process) IMR (Industrial Molder Rubber) 1. Verify 1 pc from each lot per MFT latest drawing. Read ALL notes and past Receiving Inspection History. 2. Verify correct/current Part Number and revision between MFT PO, MFT drawing, supplier packing slip and part markings. 3. Verify material/finish/plating. **Meter for annodize plating. 4. Closely check all critical dimensions (dimensions within oval on MFT drawing). Tools Required: • 6” Mitutoyo Caliper with SPC data cable. o .5 - .65” Adapter with .64969” Calibration Ring