Parts Inspection Lookup
ID:
Part Number:
Dimension:
Description:
Target:
Upper Limit:
Lower Limit:
Notes:
6-2-08vp: Inspection Criteria 1. Verify 1 pc from each lot per MFT latest drawing. Read ALL notes and past Receiving Inspection History. 2. Verify correct/current Part Number and revision between MFT PO, MFT drawing, supplier packing slip and part markings. 3. Verify material/finish/plating. Tools Required: • Mitutoyo 3 Point Bore Gage o .65 - .8” Adapter with .79995” Calibration Ring • 0-1" Mitutoyo Micrometer with SPC data cable/ Mic Stand optional.